Shell Place Concept Study
Information
Department: | Engineering | Sponsors: | |
---|
Category: | Report |
---|
Body
THAT Administration be directed to proceed with design of the Shell Place stadium concept;
THAT $7M be allocated from the Capital Infrastructure Reserve for completion of the design work; and
THAT a proposed budget for construction of the Shell Place stadium project be brought forward for Council’s consideration as soon as design is complete.
Meeting History
RESULT: | DEFERRED [UNANIMOUS] | Next: 3/26/2019 12:00 PM | MOVER: | Phil Meagher, Councillor | SECONDER: | Claris Voyageur, Councillor | FOR: | Don Scott, Mike Allen, Krista Balsom, Bruce Inglis, Keith McGrath, Phil Meagher, Jeff Peddle, Jane Stroud, Claris Voyageur | ABSENT: | Sheila Lalonde, Verna Murphy |
|