1. THAT Administration be directed to proceed with the current scope of the Firebreak Rehabilitation and Trail Restoration project, which is to grade, topsoil and seed the area from back of property line to 30 metres and the area beyond 30 metres will be graded, seeded and trees will be planted (in 2019) and where possible, trails will be moved to the furthest extent possible.
2. THAT Administration be directed to proceed with an education campaign in 2018 and in 2019 begin the targeted enforcement of encroachments on municipal lands, by area, starting with the firebreak rehabilitation areas.